Dholera Group

Register of companies · Dholera SIR · REV 1 · 4 August 2026

201820232026

Biggest construction contracts awarded in Dholera SIR, by value

Integrated Healthcare Facility, Dholera - construction work, awarded to Joint venture of M/s SCC Infrastructure and M/s P. R. Patel & Co. on 2024-12-16, is the largest disclosed contract in Dholera SIR at ₹133.68 Crore, out of 9 awarded records of which 7 carry a value, verified 4 August 2026 in DICDL's annual reports.

Entries7 ranked of 9
Ranked onDisclosed award value
Unit rankedThe contract, not the company
Last verified2026-08-04
Construction and service contracts awarded in Dholera SIR, 7 of 9 carry a disclosed value. This list ranks the individual awards rather than the companies holding them, so a contractor with two awards appears twice and a joint-venture award appears once under the venture. Value in INR crore exactly as printed. Tender ID is null on every award in every source and the evidence column says so on each row. Source: DICDL annual reports FY2023-24 and FY2024-25 plus one REPORTED trade-press record. Last verified 4 August 2026.
RankWork awardedAwardeeValueAward dateBasisStatusDocument, page and tender IDVerified
1Integrated Healthcare Facility, Dholera - construction workJoint venture of M/s SCC Infrastructure and M/s P. R. Patel & Co.₹133.68 Crore2024-12-16EPCUnder construction; construction started February 7, 2025DICDL 9th Annual Report FY2024-25, signed 10 November 2025, page 22 no tender ID published2026-08-04 OFFICIAL
2Design and Construction of Administration and Business Centre of Dholera (ABCD) Building, DSIR, DholeraM/s. Cube Construction Engineering Limited (CCEL)72,31,11,111/-not publishedEPCContractor has raised five claims against DICDL (build-up area excess, steel difference/escalation, extra foundation cost, outstanding maintenance bills, bank guarantee extension charges); disclosed under contingent liabilities.DICDL 9th Annual Report FY2024-25, signed 10 November 2025, page 100 no tender ID published2026-08-04 OFFICIAL
3Design and construction of 'Service Area Building' in Dholera Special Investment RegionNila Infrastructures LimitedRs. 46.21 Cr.not publishedEPCReported as won/awarded in 2019. Current status not verified in any government document opened for this dataset.https://cablecommunity.com/nila-infrastructures-wins-contract-for-dholera-industrial-city/ no tender ID published2026-08-04 REPORTED
4Integrated School, Dholera - construction workM/s Build Well Engineers₹27.99 Crore2025-02-28EPCUnder construction; construction started June 13, 2025DICDL 9th Annual Report FY2024-25, signed 10 November 2025, page 24 no tender ID published2026-08-04 OFFICIAL
5Accommodation Facilities for Investors, Dholera Activation Area - construction workM/s Unique Builders₹26.72 Crore2025-03-27EPCUnder construction; construction started April 24, 2025DICDL 9th Annual Report FY2024-25, signed 10 November 2025, page 25 no tender ID published2026-08-04 OFFICIAL
6Fire Station, Dholera - construction workM/s Aditya Infrabuilcon Pvt. Ltd.₹20.12 Crore2025-02-28Item Rate contractUnder construction; construction started May 09, 2025DICDL 9th Annual Report FY2024-25, signed 10 November 2025, page 26 no tender ID published2026-08-04 OFFICIAL
7Food Court, Dholera Activation Area - construction workM/s. SCC Infrastructure₹17.47 Crore2025-05-07EPCUnder construction; construction started June 04, 2025DICDL 9th Annual Report FY2024-25, signed 10 November 2025, page 23 no tender ID published2026-08-04 OFFICIAL
Awards with a disclosed value: 7344.50 INR crore
 Design, Construction, Operation and Maintenance of Water Treatment Plant (WTP) in Dholera Special Investment RegionM/s. SPML Infra Limited (SPML)not publishednot publishednot statedTERMINATED by DICDL on January 01, 2021 for non-fulfilment of contract terms. Performance BG of ₹675 Lakhs and mobilisation advance BG of ₹990 Lakhs encashed; retention money of ₹206.43 Lakhs forfeited. SPML has invoked arbitration claiming ₹7,752 Lakhs and filed a case before the Commercial Court, Ahmedabad; DICDL has filed a counter arbitration claim of 2,22,723.22 lakhs. Proceedings in progress.DICDL 9th Annual Report FY2024-25, signed 10 November 2025, page 100 no tender ID published2026-08-04 OFFICIAL
 Tent City, Dholera - eco-luxury retreat, construction plus 10-year operations periodM/s Kamnath Private Limited₹1.55 Crore (management fees receivable BY DICDL)2025-03-27PPP (Public Private Partnership), 10-year operations periodUnder construction; construction started May 27, 2025DICDL 9th Annual Report FY2024-25, signed 10 November 2025, page 27 no tender ID published2026-08-04 OFFICIAL
Awards with no value in any source: 2no data

9 rows, 7 ranked · source DICDL annual reports FY2023-24 and FY2024-25 · status as of 31 March 2025 · last verified 4 August 2026 · tags OFFICIAL and REPORTED

No paid placement. No company can buy a position, a listing or a removal. Nothing on this site is for sale, no developer, broker or agency has paid for anything here, and no advertising is carried. Rank is computed from the public column named on this page and from nothing else.

02

How this list is ranked, and what would move a company up it

Rank is the value DICDL discloses for that single award, largest first. Two awarded records carry no value in any source opened, including the terminated water treatment plant contract; they sit below the band rather than at zero. One record is tagged REPORTED because it comes from trade press and no government document opened corroborates it, and the verified column carries that tag.

The annual report labels most of these figures total project cost rather than contract amount. Only the administration and business centre award is printed explicitly as a contract amount, 72,31,11,111 rupees. A total project cost and a contract amount are not the same quantity, and this site does not silently treat them as one.

What would move an award up this list. Only a larger figure printed by DICDL. Two things this list cannot show: the estimated value of any award, which is null on every record so no bid against estimate can be computed, and the five Government of India approved infrastructure packages totalling INR 2,784.83 crore, which no source opened breaks into contractors or values. Both gaps are set out at not listed.

03

The same public records, ranked on a different column

Every list on this site sorts on a different published column or ranks a different kind of thing · all twelve lists

04

Check every row yourself

Each row above carries the identifier of the record it came from and, where the source publishes one, a link straight to the government page. The rule used to join a name in one register to a name in another is set out on the methodology page, the full company set is at the register, and the whole thing is downloadable as JSON and CSV. If a row is wrong, send the public document that shows it and it will be corrected and dated: [email protected].